Dec 9 2012: almost there…

Chuck Linick came over, and we attached the shift linkage, and tightened the flange nuts.

Brad arrived, and we attached the throttle and choke cables, soldered the throttle end, and adjusted them.

Some things take much more time than I expected, others less, but working on a custom Mini always has challenges, usually accessibility!

IMG_1705

Allen then joined us, and we routed and connected the oil temp sensor into the oil cooler, attached the sump guard, set the initial ignition timing, and attached the dogbone engine mount.

IMG_1706

Allen and I then put the car back on the ground.

IMG_1704

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s