June 10: mission accomplished.

During the day, I acquired parts, and then in the early evening, Brad arrived – as promised – and we set a goal of getting the subframe power unit installed in the chassis.

IMG_2776

We installed the steering rack, the oil filter, and the speedo cable first.

Then we jacked the car, and manuvered the unit in front.

.IMG_2778

IMG_2780

IMG_2781

We tightened the four bolts that drop into the towers, and the two that fit from the front.

IMG_2783

A good night’s effort!

Next is attach the rear chassis bolts, and the transmission mount.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s