August 23-4, 2013: Prep for Shaker Square, and a milestone…

The current specs for our care are at: mini-specs

On Aug 23 I did some prep, and then on Aug 24, I mounted the sump guard.

Sump guard
Sump guard

Ed Mayer came over, and we checked and set the timing again – 5 degrees at idle, and 30 total (around 4000 RPM).

mouth open
mouth open

We also installed the shifter boot cover.

IMG_3056

The sump guard and shifter were the last two items on my list, so phase III is complete!!

A popular item with me and our helpers has been this mat:

Kneeling, sitting, or prone: works well.
Kneeling, sitting, or prone: works well.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s